View Single Post
  #5   Report Post  
Old June 4th 08, 10:02 AM posted to uk.transport.london
John B John B is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default Blackfriars - SET services after December 2008

On 4 Jun, 10:12, wrote:
On Jun 3, 9:57 pm, "Paul Scott"
wrote:

"eNautilus" wrote in message


...


What will happen to SouthEastern train services into Blackfriars after
December 2008 - diverted to Victoria, cancelled, or will there be a
limited service continuing through to City Thameslink and terminating at
Smithfield sidings?


They will be running through to at least Kentish Town, possibly further,
although March 2009 is now believed to be the start date.


FCC drivers are currently training on dual voltage 377s, a number of which
will be transferred from Southern.


I wonder if theres an argument for extending the 3rd rail to kentish
town so dual voltage stock isn't required.


Short answer: no, there isn't.

Longer answer: dual voltage stock is easy to make and reliable, and
all post-1994 DC stock either already is or easily can be converted to
dual voltage; laying third rail [and providing the high current
substations required] is expensive, time-consuming and disruptive; and
maintaining dual AC/DC electrification is technically quite difficult.

--
John Band
john at johnband dot org
www.johnband.org