View Single Post
  #1   Report Post  
Old June 9th 08, 02:13 PM posted to uk.transport.london
John B John B is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default Whitechapel ELL works

Anyone know what the major drilling, piling and concreting work is
that TfL are doing on the ELL platforms at Whitechapel station?

I'd thought that the only new work (aside from resignalling and re-
electrifying) taking place on the northern extension was west of
Vallance Road, with the line from Whitechapel to Vallance Road taking
the same route as before...

--
John Band
john at johnband dot org
www.johnband.org