In article
,
(Jamie Thompson) wrote:

I don't know why they can't make the new island platform the same
length as the (extended) existing one, with the existing through
access line being used to provide access to both platforms on the new
face (or even just having a traditional pair of through lines
providing the access to both platforms per face). You could then also
have another pair of faces on the other side of the island for the
terminating Norwich/Ipswich services, removing conflicts with the
northbound services via Ely. That would give Cambridge 10 platforms (6
of which that could take 12 coach trains), with (if my guestimates are
good enough, still enough room for a freight line on the eastern side.
Additionally, I guess you could use the centre face of the island (the
one facing the existing face) for terminating services, leaving the
outer new face for though services south; centre terminating roads are
always useful as they don't cross either through line when entering or
exiting. That would also provide a pair of 12-car terminating
facilities at Cambridge for not much more than the cost of the island
anyway, as most of the additional work would mainly be trackwork and
signalling.

Thoughts?


Sounds about the size of it. I've not seen the plans in enough detail to
know how they will use the scissors crossover with the new island
platform or how long the island will be. I understand that the through
freight lines will be retained.

--
Colin Rosenstiel