View Single Post
  #44   Report Post  
Old August 17th 08, 02:57 PM posted to uk.transport,uk.transport.london
John Wright John Wright is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2007
Posts: 28
Default TfL Admits Livingstone Regime Deliberately Obstructed TrafficFlows

Roland Perry wrote:
In message , at 11:45:29 on Sun, 17
Aug 2008, JNugent remarked:
I am not aware of any other significant highway building inside the
M25 (whether inside or outside London) in the last 20 years, let alone
10.


If you expand the horizon to 20 years, then that brings into scope the
Limehouse Link (and obviously a whole bunch of local roads in Docklands
- but let's not get in a wrangle about how "significant" they are).

Also my 1988 map doesn't have the A12 extension through Leyton down to
Stratford, but I forget exactly when that opened.

On the other side of London they widened the A40, including the stretch
past Hillingdon, in the early 90's (the slightly relocated station
opened in 1992).

And I expect some of the widening of the North Circular was still taking
place in that timeframe too.


If you allow 20 years theres the series of underpasses along the A40
which abolished (amongst others) the notorious Hanger Lane Gyratory
system. This went on at more or less the same time as the widening. I
think that's less than 20 years ago.

--
John Wright

"What would happen if you eliminated the autism genes from the gene pool?

You would have a bunch of people standing around in a cave, chatting and
socialising and not getting anything done!" - Professor Temple Grandin