View Single Post
  #49   Report Post  
Old September 22nd 08, 05:59 AM posted to uk.railway,uk.transport.london
Mr Thant Mr Thant is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default NLL Camden Road work package reduced

On 19 Sep, 20:56, Jamie Thompson wrote:

Enough to have freight lines between Ally Pally and Finsbury (the ones
being upgraded to passenger grade)


My point about the Goblin is that the southbound ECML freight line is
the easternmost track, while the Harringay curve is on the west side,
and in between lie the fast lines and the slow lines. Whereas there's
non-conflicting access to the NLL via the Canonbury curve and Camden
Incline.

....though I'd imagine the Welwyn
bottleneck forces much of the traffic onto the WCML and MML.


I believe freight is sent via Hertford North.

U