View Single Post
  #2   Report Post  
Old September 24th 08, 10:07 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
The Real Doctor The Real Doctor is offline
external usenet poster
 
First recorded activity at LondonBanter: Feb 2008
Posts: 238
Default Crossrail Update

On 24 Sep, 20:48, 1506 wrote:
On Sep 24, 9:13 am, allan tracy wrote:

According to Private Eye, the ‘it's all gone quiet’ surrounding the
Crossrail project is due to the treasury having not yet signed off on
it.


Rumour is they won’t either and that the DfT is working furiously on a
cut down cheaper version involving tube size tunnels.


Perhaps with the current financial crisis, it’s not anticipated that
quite so many will be commuting to the City in future years.


This, if true, is very bad news. The day will come when Londonners
will regret it.


Just remember that the current estimated cost of Crossrail is the same
as the Jubilee Line Extension (roughly the same length of tunnel,
twice as many stations) AND the Channel Tunnel Rail Link (same length
of tunnel plus 60 miles of track) AND the WCML works (revamp of 400+
route miles, Trent Valley quadrupling) PUT TOGETHER.

Ian