Thread
:
Visible signs of Thameslink 2000
View Single Post
#
32
October 20th 08, 11:37 AM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Visible signs of Thameslink 2000
In article ,
(Roland
Perry) wrote:
In message
,
at 14:35:03 on Sun, 19 Oct 2008, Mr Thant
remarked:
The most significant parts of it don't happen until 2012-15
(rebuilding London Bridge and adding flyovers on its approaches,
wiring up the ECML connection, and replacing the whole fleet), so
you'd probably want to call it Thameslink 2015*.
(* unless you're in the camp who thinks the second phase won't
happen,
which I've been pondering joining)
Thameslink 2015 it is, then
I won't believe it's finished until
I can get a through train from Cambridge to Gatwick - one of the
original attractions of the scheme for me.
Indeed, for me too. Will they be running them?
And what tickets can I get this week for Cambridge-London Zones 1-2, then
Clapham Jcn-Gatwick Airport, return via Thameslink St Pancras/King's
Cross? I'm assuming Saver Return Cambridge-Zones 1/2, Saver Return London
Terminals-Gatwick (not Gatwick Express).
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]