Thread: DLR delays?
View Single Post
  #14   Report Post  
Old November 11th 08, 11:51 PM posted to uk.transport.london
[email protected] mudchute@googlemail.com is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2008
Posts: 10
Default DLR delays?

The reason given last night for the closure of Bank DLR station was
faulty ventilation equipment in one of the tunnels between Shadwell
and Bank. I assumed it was the same problem this morning. Bank DLR is
closed all too often these days which is a pain while Tower Gateway is
closed and there is no East London Line from Shadwell.

This evening, dodgy signals were to blame for the fact they were
running a shuttle between Lewisham and Cutty Sark and between Cutty
Sark and Bank.