View Single Post
  #4   Report Post  
Old November 27th 08, 09:27 AM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
John B John B is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default Crossrail NOT making connections

On Nov 27, 9:33*am, Boltar wrote:
Crossrail should take over the Hammersmith branch. *But there is the


What would be the point of that? It wouldn't make the service any
quicker and would reduce the number of trains on the northern part of
the circle line.


Cutting out the flat junction at Praed Street, which creates a clear
run from High Street Kensington to east of Baker Street and reduces
the performance pollution that makes the Circle a misery. You'd
compensate by extending the Wimblewares to Barking (or to Aldgate and
Met to Barking, or whatever).

question of a maintenance depot for the Circle Line. *If the depot at


And probably a question of loading gauge too I suspect.


Unlikely - C-stock are a reasonable size. Platform length would be a
problem though.

--
John Band
john at johnband dot org
www.johnband.org