View Single Post
  #8   Report Post  
Old December 1st 08, 05:36 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
Tom Anderson Tom Anderson is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 3,188
Default Crossrail NOT making connections

On Mon, 1 Dec 2008, 1506 wrote:

On Nov 27, 6:24*am, Tom Anderson wrote:
On Thu, 27 Nov 2008, Boltar wrote:

And probably a question of loading gauge too I suspect.


I *think*, but am not sure, that the H&C trains are wider and taller than
Crossrails will be. However, i think Crossrail carriages will be longer,
which increases their effective size on curves, so you could be right. And
of course they'll be much longer, which would mean platform alterations,
and the moving of the crossover at Hammersmith.


All true, but in the bigger picture, these are minor engineering type
problems.


In the bigger picture, isn't pretty much everything we discuss on this
group? What it comes down to is how much cold, hard cash has to be stumped
up for it, and how much value it delivers in return. I'm not saying that
Crossrailing the H&C branch wouldn't be good value for money, but i don't
think you can just wave away the costs as minor engineering type problems.

tom

--
All roads lead unto death row; who knows what's after?