View Single Post
  #34   Report Post  
Old January 10th 09, 05:48 PM posted to uk.transport.london
Dr J R Stockton Dr J R Stockton is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2006
Posts: 29
Default Normal crap service resumed

In uk.transport.london message
dia.com, Fri, 9 Jan 2009 03:38:34, Steve Dulieu steve.dulieu@greenyond
er.co.uk posted:

The SOP for this situation used to be to get a set of gap jumper leads
(basically a 640 volt extension lead, with a plug to go into the side
of the train on one end and a pair of shoes to go onto an adjacent
possie and neggie rail on the other) that were stored locally to where
trains could be gapped.


ISTM that each train could be equipped with an electric cable long
enough to reach either to the cable of a nearby train or to a shoe
assembly (or with an SCD, a winch, some rope, and an anchor).

--
(c) John Stockton, Surrey, UK. Turnpike v6.05 MIME.
Web URL:http://www.merlyn.demon.co.uk/ - FAQish topics, acronyms, & links.
Proper = 4-line sig. separator as above, a line exactly "-- " (SonOfRFC1036)
Do not Mail News to me. Before a reply, quote with "" or " " (SonOfRFC1036)