View Single Post
  #66   Report Post  
Old January 20th 09, 07:15 PM posted to uk.railway,uk.transport.london
Paul Scott Paul Scott is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Watford rail link support boost

Mr Thant wrote:

This is what Peter Field had to say to the Transport Committee in
November (which is the only official mention of 165s I know of):


snipped

.... They will relieve the situation in the
shorter term before the new trains arrive, which will be to the London
Overground standard, as you know, with lots and lots of capacity, a
much longer vehicle."

Which implies they'll be replacing the whole fleet.

(and I take it to mean that we'll be waiting a very long time for the
172s)

http://www.london.gov.uk/assembly/tr...appendix-a.pdf


It seems to suggest that the 172s:

" will be to the London Overground standard, as you know, with lots and lots
of capacity, a much longer vehicle."

However most previous reports on the 172s for Goblin have said they'll have
a fairly normal internal layout, ie unlike the 378s, so that the Rosco will
have no trouble moving them on elsewhere eventually. As for 'much longer',
AFAICS the choices are 20m or 23m within normal UK gauge...

Paul S