In message
, at
03:18:37 on Mon, 9 Feb 2009, lonelytraveller
remarked:
* * * * * * * * * * *|
* * * *=============================
* * * * * * * * * * *| 3 4
* * * * * * * ssss----------sssstairs
* * * * * * * * * * *1 2 |
* * * *=============================
* * * * * * * * * * * * *|
ie at site 1,2,3,or 4?
I'm not exactly sure what your diagram represents,
It's the way the passages are shown on the diagram I have used when
constructing:
http://www.perry.co.uk/images/kx-composite.jpg
as the passage
south of the victoria line should join up with the passage north of
it. But essentially, the lift is being added in the position you've
written "ssss" on the left hand side of the "----"
A more accurate diagram for the victoria line would look like
|
=============================
|
Lift | stairs
|
=============================
|
That is what they call the "phase 1" layout (albeit with the lift
missing), but my diagram above is base don the "phase 2" final version.
Or are they not doing that final bit of adjusting after all?
--
Roland Perry