Default East London Line phase 2b to Clapham Jn is GO!

DERWENT East London Line phase 2b to Clapham Jn is GO!
Mon, 16 Feb 2009 10:33:12 -0800 (PST), Mizter T


On 16 Feb, 16:42, wrote:

On Feb 13, 4:04*pm, Mr Thant
wrote:


2) *At Clapham Junction, is the platform entirely already there? *Or
would there have to be some construction work?


Platform 1 has to be reinstated - this will require work to the deck
it sits on. Platform 1 is the other side of the island platform from
platform 2 (obvious I suppose!), which is the platform currently used
by the LO/ WLL trains today. There were some rumours that cost cutting
meant they were going to try and both the whole ELLX and WLL services
from a single platform (p2) but this would be insane, asking for
trouble and essentially unworkable - the scheme needs p1 to be
reinstated.


There's a whole load of signalling equipment installed in that space
which will need to be moved to new homes.


PRAR
--
http://www.i.am/prar/ and http://prar.fotopic.net/
As long as people will accept crap, it will be financially profitable to dispense it. --Dick Cavett
Please reply to the newsgroup. That is why it exists.
NB Anti-spam measures in force
- If you must email me use the Reply to address and not