377 on Thameslink
On 18 Mar, 13:59, EE507 wrote:
On Mar 18, 1:20*pm, John B wrote:
Just been to a meeting in London Bridge, for which I was 30 mins late
due to Thameslink Programme-related amusement.
Went to Farringdon to catch the 1029 to Brighton, which was initially
reported as 2 mins late, then eventually turned up at 1035. To my mild
surprise, it was a Southern-liveried 377/2 - didn't get the unit
number.
Even if the AC/DC problems were a glitch, there is literally no chance
of keeping to the rush-hour timetable if they can't sort out the door
opening delays...
The typical door release delay at Victoria is about 15 seconds - one
would hope that this can be achieved at SPILL, Farringdon and City. 90
seconds at each of those = timetable chaos.
Indeed, 90s sounds like a fault to me, especially at open-air stations
south of London Bridge where the southern 377s' GPS should already
know where it is (from use on the Brighton - Watford Junction and
Charing Cross - Caterham etc. services)
|