"Robin Mayes" wrote in message ...
"Boltar" wrote in message
om...
How exactly are you going to take apart an escalator, with another machine
in operation for 20 hours a day just inches away from you? Don't forget
there are fire alarm cables, pipes and sensors running all around the
machinery which wouldn't be able to be isolated during the time the station
is open. Where are you going to store all these parts your engineers are
removing, there's hardly enough space in stations as it is!


I gave them roughly a week to take it apart. I think thats long enough to
remove a load of steps and other assorted pieces don't you?


Refurbish and test at factory, well lets be kind and say 3 weeks.


How exactly are you going to test a new escalator without it being in the
shaft it's been designed for?


Err , you test each individual bit. How do you think any large piece of
machinary is tested? You think they build a special shaft for lifts and test
run them in the factory before they install them in a skyscraper?

If you really think you can deliver as stated above, it would seem you're
wasted doing the job you do and you'd be able to make a massive profit
bidding for contracts for escalator refurbishment by being able to undercut
bids from the likes of Kone and Otis!


Oh here we go , they standard issue "if you think you can do better why don't
you try". Yeah , I'll just go get a grant for a few hundred million to set
up my own factory. Meanwhile , back in the real world I would suggest that
the reason they take so long to fix is that LU gives them all the time in the
world to get it done , so consequently they don't bother to work hard.

B2003