View Single Post
  #17   Report Post  
Old March 25th 09, 09:23 AM posted to uk.railway,uk.transport.london
[email protected] andypurk@gmail.com is offline
external usenet poster
 
First recorded activity at LondonBanter: Feb 2006
Posts: 100
Default Extra Watford Junction - Euston services from May

On 25 Mar, 10:01, Neil Williams wrote:
On 24 Mar, 21:41, wrote:

Steve Banaghan did mention it at an Abfly meeting last October, but
said it would probably come in December 2010.


The logical conclusion to this in my view is that the infrastructure
work should be done to allow through running to St Albans on a half-
hourly 8-car service to/from Euston throughout the day with a few peak
extras, and to withdraw all stops south of Watford (and some at
Watford) from other services.


8 coach services to St. Albans looks expensive!! All of the stations
would need extended platforms and St. Albans Abbey might be a bit
cramped to fit a longer platform in. I'm not saying that it isn't a
good idea, but it would be easier to get the 30 min service running
first, with the loop at Bricket Wood (which was the original plan) and
maybe adding 4 coaches at Watford Junction. I.e. work the service like
the Birmingham services which detach / attach at Northampton.