Extra Watford Junction - Euston services from May
8 coach services to St. Albans looks expensive!! All of the stations
would need extended platforms and St. Albans Abbey might be a bit
cramped to fit a longer platform in. I'm not saying that it isn't a
good idea, but it would be easier to get the 30 min service running
first, with the loop at Bricket Wood (which was the original plan) and
maybe adding 4 coaches at Watford Junction. I.e. work the service like
the Birmingham services which detach / attach at Northampton.
Fair point, and you'd require 2 fewer units (I think), as the two that
were on the branch while 1 is sitting in the platform at Watford would
only be 4-car.
Plus realign the track from the St Albans Abbey line back into
platform 10 at Watford Junction and save plenty of money on having to
re-signal from the main line into the existing platform 11, and while
they are at it, they can put the track back in next to platform 10!
John Burke
|