View Single Post
  #20   Report Post  
Old April 6th 09, 11:54 PM posted to uk.transport.london
Mizter T Mizter T is offline
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default St Pancras Low Level


On Apr 6, 11:46*pm, Mr Thant
wrote:

On Apr 6, 11:28*pm, wrote:

So not the IEP half trains planned for Lynn?


They don't have third-rail or ATO or high-capacity doors or any of the
other features required for the 24 tph Thameslink core.

I think a plausible scenario is:
- Cambridge/King's Lynn/Peterborough fasts: 5+5 car IEP to King's
Cross
- Cambridge semi-fast/Welwyn stopping services: 12-car Thameslink


Which raises the really obvious point that some passengers from
Cambridge might opt for the Thameslink semi-fasts over the IEP fasts
if the Thameslink route gets them to where they need to be with less
fuss, and if time wise there's not much in it. Any such phenomenon
could become more apparent after Crossrail opens, what with the
interchange at Farringdon.

- Hertford Loop: High-frequency semi-segregated service to Moorgate