Crossrail under way
Roland Perry wrote:
In message
,
at 16:23:08 on Sat, 16 May 2009, Mr Thant
remarked:
There's no other reason for it being built so much earlier than the
rest of the line. The Canary Wharf Group (or whatever they're called)
must be very keen to get those shops open.
Do they have to dig the tunnels that connect to the station first, or
does the station box come first?
If they don't want the tunnels to flood, they'd better build the station box
first!
|