Thread
:
Watford Junction Oyster validators
View Single Post
#
34
June 26th 09, 07:11 PM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Watford Junction Oyster validators
In article ,
(Paul Scott) wrote:
wrote:
In article ,
(Paul Scott) wrote:
Only a subset of the 350/1s have been made ready and depot tested
for DC use, about 15 AIUI, out of the 30 in total. The 50% that do
not have the OK to work on DC wouldn't need a significant amount of
work to do so. However the whole sub class (350/1) is type cleared
for DC running, the use by SN only required route clearance.
Thanks for clarifying that.
For the 350/2s DC use would not be possible without significant
additional equipment being added.
What equipment? Just shoegear and DC fuses/circuit breakers etc,
surely?
It is still a reasonably significant amount of external hardware
across a 37 unit fleet, with 8 sets of shoe gear each.
That's 8 shoes each? Presumably 2 each side and each end of each driving
car? Just to be sure what you're counting as shoegear.
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]