Plans for a Northern Line extension from Kennington to Battersea in
South West London are gaining considerable momentum. Project developer


That would surely mean the northern line would be split into 2 lines since
it can barely cope now in its current form, never mind if another 5 miles
of line was added?


Not necessarily. This would take over trains from CX that currently
terminate in the loop at Kennington, while leaving trains from Bank to
go through to Morden as now

While the passenger experience would be less confusing if the northern
(small n) branches were split at the same time as this proposal,
there's no operational reason why you couldn't have this extension
with the existing line setup.

--