View Single Post
  #81   Report Post  
Old July 29th 09, 05:14 PM posted to uk.transport.london,uk.railway
Basil Jet Basil Jet is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2009
Posts: 400
Default First passenger service journey for LUL 09 stock

Clive wrote:
In message , asdf
writes
On Sun, 26 Jul 2009 10:37:55 -0700 (PDT), Andy wrote:

In addition, some kinetic energy will be converted to potential
energy when stopping at stations with a hump (uphill into platform,
downhill out of platform).


I'm aware that the core part of the Central Line has these humps -
does the Vic? Which other tube lines have them?


Certainly the Northern Line does.


IIRC all tube lines from the Twopenny Tube onward have them, i.e. all except
the City & South London.