Walk-through trains
"John B" wrote in message
In other words, when LU puts the Bakerloo contract out to tender,
Bombardier will be favourite to win it with something pretty similar
to the S-stock for the reasons you list (ie it'll be cheaper for them
to build and maintain the trains), and if someone else wins that's
because they want to offer us an even better deal that outweighs the
economies of scale.
Hopefully, Bombardier's Bakerloo bid will be based on the 2009, not the
S stock!
However, they won't be able to just offer more 2009 stock. For one
thing, I think the 2009 stock is too big for the Bakerloo and Picc
tunnels, so even if Bombardier's bid(s) for these lines look like the
2009 stock, they'll actually be slightly smaller.
|