Thread
:
Walk-through trains
View Single Post
#
212
August 18th 09, 07:43 PM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Walk-through trains
In article
,
(Mizter T) wrote:
On Aug 12, 7:40*pm, Paul Corfield wrote:
On Wed, 12 Aug 2009 09:15:51 +0000 (UTC),
wrote:
On Tue, 11 Aug 2009 09:32:36 -0700 (PDT)
John B wrote:
True, or at least "true so 'tis claimed". I imagine that squishing a
2009-stock to fit the Bakerloo loading gauge and adjusting the
equipment used to produce the 2009 stock to produce the squished
stock would be significantly easier than designing a Tube gauge
train and setting up a production line from scratch, though.
I think that all rather depends on assumptions about what sort of tube
train design LUL might desire for the Bakerloo Line fleet .....
A train designed for an extended Bakerloo line would be nice...
Wasn't the 1949 tube stock designed for that?
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]