View Single Post
  #217   Report Post  
Old August 20th 09, 10:22 AM posted to uk.transport.london
John B John B is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default Walk-through trains

On Aug 19, 11:17*pm, MIG wrote:
Same here - IIRC they don't fit through the Picc tunnels, so if they
need to go to Acton Works, they'll have to go by road. This
effectively makes the Picc-Vic connections at Finsbury Park redundant
(except maybe for engineering trains?). I don't have a specific
reference off the top of my head though, so I could be wrong.


They won't ever go to Acton Works, by road or otherwise. All
maintenance will be at Northumberland Park; anything that can't be
done at Northumberland Park will be done at Derby.

Engineering trains will continue to use the Picc-Vic connections at
Finsbury Park.

Is it that they actually don't fit, or just that it would be so
expensive and time-consuming to confirm whether they do that it isn't
worth it?


AIUI "they" (presumably Metronet) ran a 1967 Stock with bits of foam
stuck to it through the Picc to see if it did. Either it didn't, or
the decision was made to deliver by road anyway.

(why wasn't Northumberland Park connected to the GEML? Even in 1967
that would surely have been a more sensible way to deliver the trains
than via half the Underground network...?)

--
John Band
john at johnband dot org
www.johnband.org