View Single Post
  #27   Report Post  
Old September 9th 09, 12:38 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
[email protected] boltar2003@yahoo.co.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 459
Default EU lending for Crossrail

On Wed, 09 Sep 2009 12:48:32 +0100
Bruce wrote:
On Wed, 9 Sep 2009 10:55:13 +0000 (UTC), wrote:

If they had double deckers they wouldn't need 24tph. Even if they're not
planning UIC gauge trains, building the tunnels to UIC gauge would cost

little
if anything extra.


Nonsense. The cost of building the Crossrail tunnels to accept double
deck trains would be considerably higher.


Really, whys that then? Would the actual boring part of the TBM cost
substantially more if its diameter was increased by a metre? Would the extra
concrete cost raise the project costs much higher? Or are you just BSing
because you always want to appear to know best?

But this is britain, planning for unforseen future needs is
frowned upon as we all know.


But this is Boltar, who is an ignorant ****wit as we all know.


Ah , the irony.

B2003