Thread
:
EU lending for Crossrail
View Single Post
#
45
September 10th 09, 09:39 AM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
[email protected]
external usenet poster
First recorded activity at LondonBanter: Oct 2003
Posts: 459
EU lending for Crossrail
On Thu, 10 Sep 2009 00:17:02 +0100
Bruce wrote:
On Wed, 9 Sep 2009 14:20:42 +0000 (UTC),
wrote:
*sigh* I hate to break this pre-GCSE news to you, but the area of the
shaft of a cylinder increases *linearly* with increasing radius, not as the
square of it so the cost of the lining will not go up like that.
But as someone with [no] experience of tunnel lining design, manufacture
and installation I can tell you with authority that the larger the
diameter of the tunnel, the thicker the lining needs to be.
There , fixed it for you.
B2003
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]