View Single Post
  #57   Report Post  
Old September 11th 09, 07:46 AM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
Chris Tolley[_2_] Chris  Tolley[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2009
Posts: 175
Default EU lending for Crossrail

rail wrote:

In message
Chris Tolley (ukonline really) wrote:

Robert wrote:

The machinery driving the 'boring plate'
would have to be scaled up to cope


One suspects that since tunnels are already routinely bored to the
larger dimensions on the mainland, such kit is readily available,
whereas the factory in Liliput making the UK-sized kit went out of
business ages ago through lack of orders.


I got the impression that TBMs were custom made for each job.


I'm sure they are. But I do imagine that whoever makes them keeps the
blueprints.

--
http://gallery120232.fotopic.net/p9632845.html
(33 043 at Exeter St Davids, 1985)