![]() |
PPP Arbiter announces draft decision
TfL reckoned £4.0 bn.
Tube LInes wanted £5.75 bn. Arbiter suggesting £4.4 bn. http://www.ppparbiter.org.uk/files/u...2 0Notice.pdf Is that a result that TfL can live with? Paul S |
All times are GMT. The time now is 05:09 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk