On Feb 28, 12:44*am, Mark A wrote:
On 28/02/2010 08:04, Willms wrote: * *Mr. Adonis has concluded from the experience with the WCML upgrade, that it might be cheaper to build new instead of upgrading existing lines. M1/M6 Parkway station and Leicester. Electrify the London to Birmingham route at 25kV. Gradual straightening of the kinks caused by removal of the platform loops (e.g.) Gerards Cross. In time some sections pushed to 125, 135, or even 145 mph. There needs to be a tidying up of the interchanges with TfL's Central Line. The Underground tracks should become the center pair. Stations should be dual islands with cross platform interchange with Chiltern Local Services. In time a third out pair could be added for expresses. |