London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #21   Report Post  
Old March 6th 10, 03:17 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2010
Posts: 9
Default Chiltern Chairman Challenge Evergreen 4 - send your suggestionsto Captain Deltic!

On Mar 1, 8:14*am, "Graham Harrison"
wrote:
"1501" wrote in message

...
On 1 Mar, 03:01, E27002 wrote:





On Feb 28, 6:39 pm, "Graham Harrison"


wrote:
"Chafford" wrote in message


....


Following last month's announcement on Evergreen 3, Chiltern Chairman
Adrian Shooter is asking Modern Railways readers what Evergreen 4
should provide. Captain Deltic likes the idea of a 4 track 125mph
electrified railway but reckons that this will have to wait for
Evergreen 5 (and a potential franchise extension to 2026, according to
the article!)


Comments to Captain Deltic at:


I know new platforms have been added but how much spare capacity does
Marylebone and the approaches have?


Marylebone was designed with, and land purchased for ten platforms.
It was built with tunnels for seven approach tracks and large goods
yards. Most of the spare land has been sold including the never
utilized platform space.


Although eye-wateringly expensive to do; some of that land could
always be repurchased.

================

All of which suggests the answer to my question of how much spare capacity
does Marylebone actually have is "not a lot".


The good Captain's inbox is, no doubt, overflowing!

  #22   Report Post  
Old March 7th 10, 02:09 PM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2010
Posts: 9
Default Chiltern Chairman Challenge Evergreen 4 - send your suggestionsto Captain Deltic!



It appears that Captain Deltic's Chiltern Chairman Challenge may be
connected to further upgrade proposals from Chiltern:

This from TransportXtra 25 February:

'Delivering the Evergreen III project will see Chiltern’s franchise
extended from its current guarantee of 12.5 years to run for its full
20-year term, but Shooter said that he was continuing to work up
further investment projects for the network which he expected to
reveal shortly.'


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Chiltern Chairman Challenge Evergreen 4 - send your suggestionsto Captain Deltic! E27002 London Transport 10 March 7th 10 10:02 PM
Chiltern Chairman Challenge Evergreen 4 - send your suggestionsto Captain Deltic! E27002 London Transport 0 March 2nd 10 09:12 PM
Chiltern Chairman Challenge Evergreen 4 - send your suggestionsto Captain Deltic! E27002 London Transport 0 February 28th 10 07:20 PM
DLR Train Captain Texting Whilst 'Driving' SB London Transport 118 December 8th 09 05:24 PM
Evergreen 2 Tom Anderson London Transport 3 May 11th 07 08:14 PM


All times are GMT. The time now is 01:31 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017