London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old April 12th 10, 01:33 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default Upgrading sub surface tube lines to 750V

I read about this in wikipedia but is it actually going to happen? If so what
will happen on sections where tube and sub surface stock run on the same track
- ie raynors lane to uxbridge and acton town to ealing common. Will these
sections be kept at 630V or will the piccadilly stock be able to handle 750V
anyway?

B2003

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
West London Sub-Regional Transport Plan Slidecage London Transport 1 June 28th 11 10:32 AM
New KXSP sub surface station kytelly London Transport 9 July 31st 06 06:24 PM
TfL / NLL / Metronet surface stock / tube stock / Croxley link John B London Transport 4 March 8th 06 09:51 PM
Upgrading GNER ticket to First Class Cameron Davies London Transport 1 April 14th 04 02:39 AM


All times are GMT. The time now is 11:15 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017