Default NLL re-opening....

As I understand it, the NLL (Stratford to Gospel Oak) will reopen but I
take it that there's going to be nothing huge delivered on June 1st to
make it a huge deal?

Other than some new platforms, and traveling on slightly different
tracks, there will be no increase in service levels (still 4ph during the
day, 3ph later in the evening?) and 3 car trains? (and the same naff
weekend closures that we had before the blockade....?)

Roll on 2011!! It will be VERY nice indeed when it's all finished, but
until then....

  #2   Report Post  
Old May 26th 10, 04:38 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2009
Posts: 209
Default NLL re-opening....

On May 26, 9:27*am, Martin Petrov
wrote:
As I understand it, the NLL (Stratford to Gospel Oak) will reopen but I
take it that there's going to be nothing huge delivered on June 1st to
make it a huge deal?

Other than some new platforms, and traveling on slightly different
tracks, there will be no increase in service levels (still 4ph during the
day, 3ph later in the evening?) and 3 car trains? (and the same naff
weekend closures that we had before the blockade....?)

Roll on 2011!! It will be VERY nice indeed when it's all finished, but
until then....


IIRC the NLL was closed for enabling works. I think the Hampstead
Tunnels are being enlarged for bigger containers. And, also the AC
tracks are being moved to take over the northern most pair east of
Camden road, thus leaving room for the ELL extension to Highbury and
Islington.

Can anyone confirm? Cueing Mizter T. :-)


  #3   Report Post  
Old May 26th 10, 04:40 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 197
Default NLL re-opening....

On 26 May, 17:38, E27002 wrote:
On May 26, 9:27*am, Martin Petrov
wrote:

As I understand it, the NLL (Stratford to Gospel Oak) will reopen but I
take it that there's going to be nothing huge delivered on June 1st to
make it a huge deal?


Other than some new platforms, and traveling on slightly different
tracks, there will be no increase in service levels (still 4ph during the
day, 3ph later in the evening?) and 3 car trains? (and the same naff
weekend closures that we had before the blockade....?)


Roll on 2011!! It will be VERY nice indeed when it's all finished, but
until then....


IIRC the NLL was closed for enabling works. *I think the Hampstead
Tunnels are being enlarged for bigger containers. *And, also the AC
tracks are being moved to take over the northern most pair east of
Camden road, thus leaving room for the ELL extension to Highbury and
Islington.

Can anyone confirm? *Cueing Mizter T. *:-)


I think that was the plan, since the ELL would merge with the NLL
alignment from the south.
  #4   Report Post  
Old May 26th 10, 04:59 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default NLL re-opening....

E27002 wrote:

IIRC the NLL was closed for enabling works. I think the Hampstead
Tunnels are being enlarged for bigger containers.


The Hampstead tunnel gauge clearance was completed during 2008. They are
nothing to do the current NLL work, which is all east of Gospel Oak, on the
Stratford route...

Paul S




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELL/NLL interchange Paul Scott London Transport 15 March 17th 07 11:27 AM
NLL Closure / DLR to Stratford International Paul Corfield London Transport 32 November 25th 06 12:05 AM
Will Oyster PP be valid on the NLL ? Richard M Willis London Transport 12 June 23rd 06 01:13 PM
TfL / NLL / Metronet surface stock / tube stock / Croxley link John B London Transport 4 March 8th 06 09:51 PM
NLL via Crossrail tunnels Dave Arquati London Transport 0 September 10th 03 10:49 PM


All times are GMT. The time now is 02:13 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017