![]() |
Ex- Underground Carriages to meet capacity requirements?
On Sep 30, 1:02*am, 1506 wrote:
It occurs to me that with some track modification, District and Circle stock, could run on the Euston to Watford DC lines. *This might allow other stock to usefully be deployed elsewhere on the Overground. If you're going to do that, why withdraw the 313s in the first place? I think 313s would be preferable to knackered C-stock. Neil |
Ex- Underground Carriages to meet capacity requirements?
On Sep 30, 10:18*am, Neil Williams wrote: On Sep 30, 1:02*am, 1506 wrote: It occurs to me that with some track modification, District and Circle stock, could run on the Euston to Watford DC lines. *This might allow other stock to usefully be deployed elsewhere on the Overground. If you're going to do that, why withdraw the 313s in the first place? I think 313s would be preferable to knackered C-stock. I don't think London Overground is set to be short of rolling stock - TfL managed to work things quite well in terms of getting funding for a sufficient number of trains (which will cover the increased service frequencies that are in the pipeline). |
All times are GMT. The time now is 02:58 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk