London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old March 17th 11, 03:17 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default Crossrail platform mock up

"Graham Harrison" wrote in message
...

Am I right in thinking Crossrail will have trains of different lengths
operating? Having indicators over the platform doors would then double
up as indicators to which doors would open.


Originally it was going to be two 5x20m units in multiple, with single units
used offpeak, but the recent ITT is for a fleet of 10 car fixed formation
trains. (There is a caveat though, as apparently some trains will
temporarily enter service between Shenfield and Liverpool St in an 8 car
formation.)

Paul S

  #2   Report Post  
Old March 17th 11, 03:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2008
Posts: 278
Default Crossrail platform mock up


"Paul Scott" wrote in message
...
"Graham Harrison" wrote in
message ...

Am I right in thinking Crossrail will have trains of different lengths
operating? Having indicators over the platform doors would then double
up as indicators to which doors would open.


Originally it was going to be two 5x20m units in multiple, with single
units used offpeak, but the recent ITT is for a fleet of 10 car fixed
formation trains. (There is a caveat though, as apparently some trains
will temporarily enter service between Shenfield and Liverpool St in an 8
car formation.)

Paul S


Ok, nice theory blown away!

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Siemens Inspiro LUL Mock-Up [email protected] London Transport 5 October 19th 13 02:09 PM
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 06:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 03:06 PM
No platform adverts at St Paul's Vic London Transport 2 August 1st 03 03:48 PM


All times are GMT. The time now is 06:56 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017