Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#19
![]() |
|||
|
|||
![]()
On Wed, 14 Mar 2012 18:27:42 +0000, Mizter T
wrote: The contract is only for ticket offices, escalators and platforms because it would have required major construction work to have added connectivity to the network's tunnels. A pity they seem to have ruled out connectivity within the tunnels/trains themselves. Subway systems in other parts of the world have been able to achieve this, apparently without too much difficulty. Chris |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tube driver wins claim for unfair dismissal - strikes off? | London Transport | |||
Hospital rail link idea wins prize | London Transport | |||
First Group wins Thames Franchise | London Transport |