![]() |
Govt. dropping HS2?
On May 7, 11:54*am, ian batten wrote:
On May 7, 10:41*am, bob wrote: But given the requirement for HS2 is driven by capacity rather than speed, in a "we decided not to build HS2" world, in order to meet the capacity demands for travel between Manchester, Birmingham and London, the trains will almost certainly resemble crush loaded commuter stock much of the time, So electrify the Chiltern Line, (~£400m), re-open passing loops and do some selective quadrupling at the southern end (~£500m) and buy a load of cheap non-tilting 125mph stock to operate an intensive 6tph Birmingham to London service (say £2m/vehicle, 30 x 10-car sets = ~ £600m), then figure out what to spend the remaining £33.5bn on. Way to go! I have long thought this the better solution. And, while they are at it please, please could they do something about the appalling interchange at West Ruislip. The TfL part of the station needs to change to side platforms. The platform adjacent to the GC/GW Chiltern Northwest bound should be the primary one for terminating trains. The opposing one only used, in the peaks, when the primary one is in use. Northwest bound Central Line would then have a cross platform interchange to Northwest bound Chiltern trains. It is very annoying to arrive next to the Chiltern platform and have to negotiate two sets of stairs in order to reach it. |
All times are GMT. The time now is 09:06 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk