London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #13   Report Post  
Old November 30th 12, 07:35 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 22
Default New LO in car line diagram for ELLX Phase 2

On Thu, 29 Nov 2012 17:48:37 -0600,
wrote:

In article ,

(Charles Ellson) wrote:

On Thu, 29 Nov 2012 13:22:54 -0800 (PST), e27002
wrote:

Can dual voltage stock reaches the East London section, and its
branches to the south?

Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/

Things would be clearer if there was a picture taken along platform 7 in the
other direction. I've got the shot but not on the web.


You mean platform 2.
--
Roger
  #15   Report Post  
Old November 30th 12, 09:03 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default New LO in car line diagram for ELLX Phase 2

On Thu, 29 Nov 2012 22:28:16 +0000
Charles Ellson wrote:
Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/


Looking at the line on the left the 3rd rail presumably stops halfway
down the platform, long before the overhead starts. This was obviously
done deliberately but why? Surely it means anything electric has to be
dragged to and from the 25kv and 3rd rail sections unless the driver gets some
speed up first and hopes for the best!

B2003




  #16   Report Post  
Old November 30th 12, 09:20 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,715
Default New LO in car line diagram for ELLX Phase 2

On 30/11/2012 10:03, d wrote:
On Thu, 29 Nov 2012 22:28:16 +0000
Charles wrote:
Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/

Looking at the line on the left the 3rd rail presumably stops halfway
down the platform, long before the overhead starts. This was obviously
done deliberately but why? Surely it means anything electric has to be
dragged to and from the 25kv and 3rd rail sections unless the driver gets some
speed up first and hopes for the best!


Except the right hand line has third rail at least up to the bridge the
photo was taken from. Very strange

--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail
  #17   Report Post  
Old November 30th 12, 10:35 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default New LO in car line diagram for ELLX Phase 2

On Fri, 30 Nov 2012 10:20:39 +0000
Graeme Wall wrote:
On 30/11/2012 10:03, d wrote:
On Thu, 29 Nov 2012 22:28:16 +0000
Charles wrote:
Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/

Looking at the line on the left the 3rd rail presumably stops halfway
down the platform, long before the overhead starts. This was obviously
done deliberately but why? Surely it means anything electric has to be
dragged to and from the 25kv and 3rd rail sections unless the driver gets

some
speed up first and hopes for the best!


Except the right hand line has third rail at least up to the bridge the
photo was taken from. Very strange


Thats the dead end track isn't it?

B2003


  #18   Report Post  
Old November 30th 12, 10:47 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2012
Posts: 79
Default New LO in car line diagram for ELLX Phase 2



wrote in message ...

On Fri, 30 Nov 2012 10:20:39 +0000
Graeme Wall wrote:
On 30/11/2012 10:03, d wrote:
On Thu, 29 Nov 2012 22:28:16 +0000
Charles wrote:
Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/

Looking at the line on the left the 3rd rail presumably stops halfway
down the platform, long before the overhead starts. This was obviously
done deliberately but why? Surely it means anything electric has to be
dragged to and from the 25kv and 3rd rail sections unless the driver gets

some
speed up first and hopes for the best!


Except the right hand line has third rail at least up to the bridge the
photo was taken from. Very strange


Thats the dead end track isn't it?


The right hand line ends in a buffer stop under the bridge from which the
photo was taken. The left hand line continues as the transfer line between
the ELL and the NLL. This is currently OOU, but for it to be used there will
either have to be an AC/DC interface, or anything using it will have to be
dragged by a diseasel.

Platform numbering at Highbury & Islington is bizarre. The ELL platforms (in
the photograph) are 1 and 2. The NLL platforms are 7 and 8 (the central
island is 2 and 7). 3-6 are the low level platforms for the Victoria Line
and the Northern City (Moorgate) line.

Peter

  #19   Report Post  
Old November 30th 12, 11:33 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default New LO in car line diagram for ELLX Phase 2

On Fri, 30 Nov 2012 11:47:56 -0000
"Peter Masson" wrote:
The right hand line ends in a buffer stop under the bridge from which the
photo was taken. The left hand line continues as the transfer line between
the ELL and the NLL. This is currently OOU, but for it to be used there will
either have to be an AC/DC interface, or anything using it will have to be
dragged by a diseasel.


It seems very bizarre to have a short section of unelectrified line on an
otherwise electrified system especially when its the obvious place for stock
transfer. Unless for some reason they required complete electrical seperation
between the AC and DC sections.

B2003


  #20   Report Post  
Old November 30th 12, 11:46 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,715
Default New LO in car line diagram for ELLX Phase 2

On 30/11/2012 11:35, d wrote:
On Fri, 30 Nov 2012 10:20:39 +0000
Graeme wrote:
On 30/11/2012 10:03,
d wrote:
On Thu, 29 Nov 2012 22:28:16 +0000
Charles wrote:
Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/

Looking at the line on the left the 3rd rail presumably stops halfway
down the platform, long before the overhead starts. This was obviously
done deliberately but why? Surely it means anything electric has to be
dragged to and from the 25kv and 3rd rail sections unless the driver gets

some
speed up first and hopes for the best!


Except the right hand line has third rail at least up to the bridge the
photo was taken from. Very strange


Thats the dead end track isn't it?


Don't know the station that well I'm afraid. I was last there long
before LOROL.

--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELLX phase 2 Mwmbwls London Transport 98 January 28th 08 09:03 AM
ELLX phase 2 Peter Masson London Transport 1 December 14th 07 08:26 PM
ELLX phase 2 Mizter T London Transport 0 December 14th 07 06:26 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 09:18 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017