Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#9
![]() |
|||
|
|||
![]()
On Thu, 29 Nov 2012 22:28:16 +0000
Charles Ellson wrote: Yes :- http://www.flickr.com/photos/24772733@N05/5490835946/ Looking at the line on the left the 3rd rail presumably stops halfway down the platform, long before the overhead starts. This was obviously done deliberately but why? Surely it means anything electric has to be dragged to and from the 25kv and 3rd rail sections unless the driver gets some speed up first and hopes for the best! B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
ELLX phase 2 | London Transport | |||
ELLX phase 2 | London Transport | |||
ELLX phase 2 | London Transport | |||
Latest official Crossrail Line Diagram | London Transport |