London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old November 30th 12, 12:06 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default New LO in car line diagram for ELLX Phase 2

wrote in message
...
On Fri, 30 Nov 2012 11:47:56 -0000


It seems very bizarre to have a short section of unelectrified line on an
otherwise electrified system especially when its the obvious place for
stock
transfer. Unless for some reason they required complete electrical
seperation
between the AC and DC sections.


According to posts elsewhere a year or two back it is a simplified system
which does achieve electrical separation, and therefore can only be used for
irregular movements, it is not designed for timetabled operation.

The normal means of transfer of stock is via a number of route options in
south London onto the WLL.

Paul

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELLX phase 2 Mwmbwls London Transport 98 January 28th 08 09:03 AM
ELLX phase 2 Peter Masson London Transport 1 December 14th 07 08:26 PM
ELLX phase 2 Mizter T London Transport 0 December 14th 07 06:26 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 06:16 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017