London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #17   Report Post  
Old November 30th 12, 01:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 22
Default New LO in car line diagram for ELLX Phase 2

On Fri, 30 Nov 2012 14:09:17 -0000, "Paul Scott"
wrote:

"Roger" wrote in message
.. .

My point is that from an operational point of view dual voltage
is not required (unless they've put AC between Surrey Quays and
Queens Road Peckham). So why does Colin Rosenstiel think there
may be more dual voltage running down the ELL, unless that is
all that is available.


He isn't suggesting more 'dual voltage running', but more dual voltage
trains running in DC mode.


Misunderstanding on my part. I didn't know that there was
insufficient DC only stock.
--
Roger
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELLX phase 2 Mwmbwls London Transport 98 January 28th 08 09:03 AM
ELLX phase 2 Peter Masson London Transport 1 December 14th 07 08:26 PM
ELLX phase 2 Mizter T London Transport 0 December 14th 07 06:26 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 01:35 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017