London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old November 30th 12, 01:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 22
Default New LO in car line diagram for ELLX Phase 2

On Fri, 30 Nov 2012 14:09:17 -0000, "Paul Scott"
wrote:

"Roger" wrote in message
.. .

My point is that from an operational point of view dual voltage
is not required (unless they've put AC between Surrey Quays and
Queens Road Peckham). So why does Colin Rosenstiel think there
may be more dual voltage running down the ELL, unless that is
all that is available.


He isn't suggesting more 'dual voltage running', but more dual voltage
trains running in DC mode.


Misunderstanding on my part. I didn't know that there was
insufficient DC only stock.
--
Roger
  #2   Report Post  
Old November 30th 12, 01:42 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default New LO in car line diagram for ELLX Phase 2

"Roger" wrote in message
...

He isn't suggesting more 'dual voltage running', but more dual voltage
trains running in DC mode.


Misunderstanding on my part. I didn't know that there was
insufficient DC only stock.


I've checked the numbers and it looks like there are 25 diagrams required
for the ELL branches from the timetable change, so on the assumption that
they'll have 2 or 3 of the 20 DC units undergoing maintenance at any one
time, (85% typical utilisation?) you'd normally expect to see 7 or 8 dual
voltage units (out of the fleet of 37) in use on the ELL on a daily basis.

Paul S



  #3   Report Post  
Old November 30th 12, 01:52 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default New LO in car line diagram for ELLX Phase 2

"Paul Scott" wrote in message
...

I've checked the numbers and it looks like there are 25 diagrams required
for the ELL branches from the timetable change, so on the assumption that
they'll have 2 or 3 of the 20 DC units undergoing maintenance at any one
time, (85% typical utilisation?) you'd normally expect to see 7 or 8 dual
voltage units (out of the fleet of 37) in use on the ELL on a daily basis.


PS - I see in the District Dave forum's similar discussion someone's
posted:

"The ac/dc units only need show the NLL/WLL and Watford-Euston route, unless
there is a strong likelihood of units being hijacked for the ELL/SLL".

Anyone got a login there who could put him right?

Paul S


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELLX phase 2 Mwmbwls London Transport 98 January 28th 08 09:03 AM
ELLX phase 2 Peter Masson London Transport 1 December 14th 07 08:26 PM
ELLX phase 2 Mizter T London Transport 0 December 14th 07 06:26 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 06:26 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017