London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old December 16th 12, 01:22 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2012
Posts: 16
Default London Overground - Phase 2....

While I'm sure this has been discussed before - but was there ever any
thought of running the London Overground trains along the SLL into
Victoria as well as into Clapham Junction? ie - one every 15 mins out of
Victoria, along the SLL to Highbury and then one every 15 mins from
Clapham Junction to Dalston or some such.

I suspect it must have been thought about, as it would provide some
decent options to different places out of Victoria, but presumably they
couldn't run 8 trains an hour down the SLL (plus 16 or however many
through the ELL core) and I guess anything less than 4 trains an hour out
of any of the stations is no-go these days.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
East London Line phase 2b to Clapham Jn is GO! Mizter T London Transport 74 February 18th 09 07:25 PM
ELLX phase 2 Mwmbwls London Transport 98 January 28th 08 09:03 AM
ELLX phase 2 Peter Masson London Transport 1 December 14th 07 08:26 PM
ELLX phase 2 Mizter T London Transport 0 December 14th 07 06:26 PM
DLR Capacity Enhancement Phase 2: North & East Routes Dockland London Transport 4 March 21st 06 04:24 PM


All times are GMT. The time now is 10:08 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017