London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #21   Report Post  
Old February 17th 04, 11:25 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 21
Default Eighteen LU trains damaged at Farringdon...

"Colin" wrote in
:


"Paul Corfield" wrote in message
...
On Fri, 13 Feb 2004 00:26:57 GMT, "Richard J."
wrote:

woutster wrote:

In the case of Metronet SSL, the one year "honeymoon period" has
not even lapsed. I'll come out of the closet now and say that I do
work for the above mentioned company, albeit on the stations side.
From what I have heard from someone directly invovled, is that the
work that was being done was on behalf of a contractor of LUL.

Work on the infrastructure being done by a contractor of LUL rather
than a contractor of Metronet SSL? Surely that's not way PPP is
supposed to work, is it?


But not everything being provided on the LUL network is provided by
the Infracos. Remember there are several PFI contractors which were
signed in advance of PPP to provide ticketing (Prestige), power and a
new radio network (Connect). There is also a PFI for British
Transport Police accommodation and plenty of other day to day
contracts for stationery, consultants, property maintenance for
offices etc etc etc. --
Paul C


Admits to working for London Underground!


Later reports stated that it was Balfour Kilpatrick who were working
as sub-contractors to Metronet.

Colin



Balfour Kilpatrick were installing 10,000 volt lines as sub to Metronet
as sub to Connect PFI as contractor to LUL. Now with whom does the
responsibility rest?

woutster

  #22   Report Post  
Old February 19th 04, 09:41 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2003
Posts: 102
Default Eighteen LU trains damaged at Farringdon...

woutster ) gurgled happily, sounding much like they
were saying :

Balfour Kilpatrick were installing 10,000 volt lines as sub to Metronet
as sub to Connect PFI as contractor to LUL. Now with whom does the
responsibility rest?


Easy.

It's all Ken's fault.
  #23   Report Post  
Old February 19th 04, 10:52 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2004
Posts: 62
Default Eighteen LU trains damaged at Farringdon...

Adrian wrote:
woutster ) gurgled happily, sounding much like
they were saying :

Balfour Kilpatrick were installing 10,000 volt lines as sub to
Metronet as sub to Connect PFI as contractor to LUL. Now with whom
does the responsibility rest?


Easy.

It's all Ken's fault.


Errrrrmmm, no. He was fighting to stop PPP rememeber?


  #24   Report Post  
Old February 19th 04, 11:47 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2003
Posts: 102
Default Eighteen LU trains damaged at Farringdon...

Cast_Iron ) gurgled happily, sounding much like
they were saying :

Balfour Kilpatrick were installing 10,000 volt lines as sub to
Metronet as sub to Connect PFI as contractor to LUL. Now with whom
does the responsibility rest?


Easy.

It's all Ken's fault.


Errrrrmmm, no. He was fighting to stop PPP rememeber?


But, but, but......
*EVERYTHING* is Ken's fault, isn't it?
I'm confused now...
  #25   Report Post  
Old February 19th 04, 02:37 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2004
Posts: 62
Default Eighteen LU trains damaged at Farringdon...


"Adrian" wrote in message
. 1.4...
Cast_Iron ) gurgled happily, sounding much like
they were saying :

Balfour Kilpatrick were installing 10,000 volt lines as sub to
Metronet as sub to Connect PFI as contractor to LUL. Now with whom
does the responsibility rest?


Easy.

It's all Ken's fault.


Errrrrmmm, no. He was fighting to stop PPP rememeber?


But, but, but......
*EVERYTHING* is Ken's fault, isn't it?
I'm confused now...


Do you mean as in "Ken's got a very responsible position. It doesn't matter
what happens, he's responsible"?




  #26   Report Post  
Old February 19th 04, 04:07 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 6
Default Eighteen LU trains damaged at Farringdon...


"woutster" wrote in message
40.11...

Balfour Kilpatrick were installing 10,000 volt lines as sub to Metronet
as sub to Connect PFI as contractor to LUL. Now with whom does the
responsibility rest?

woutster


Surely LUL's contract is with Connect PFI. They can delegate part or all of
the work to a sub-contractor, but not the responsibility. Any remedies LUL
might have in law are with Connect PFI, irrespective of who their
sub-contractor is. Compare with purchase of a house - your contract is with
the builder - not his subs...

PMS



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oyster Cards damaged by proximity door entry cards neill London Transport 5 March 24th 12 06:28 PM
Serious arcing at Farringdon Boltar London Transport 1 November 18th 05 09:10 AM
Farringdon Tickets Jim Brittin London Transport 2 August 31st 04 02:12 PM
We buy-back broken and damaged cell-phones of all brands. Thank you! London Transport 0 July 2nd 04 08:47 PM
Oyster cards damaged by mobile phones?? Steve London Transport 9 January 26th 04 04:03 PM


All times are GMT. The time now is 01:34 PM.

Powered by vBulletin®