London Bridge Bank holiday work
NR have published info on the rebuilding work carried out at London Bridge
over the Bank Holiday shutdown. Includes a time lapse video: http://www.networkrailmediacentre.co...-london-bridge |
London Bridge Bank holiday work
On Thursday, 3 September 2015 09:28:39 UTC+1, Recliner wrote:
NR have published info on the rebuilding work carried out at London Bridge over the Bank Holiday shutdown. Includes a time lapse video: http://www.networkrailmediacentre.co...-london-bridge What is the device at 2:45 called? |
London Bridge Bank holiday work
On 03/09/2015 13:38, wrote:
On Thursday, 3 September 2015 09:28:39 UTC+1, Recliner wrote: NR have published info on the rebuilding work carried out at London Bridge over the Bank Holiday shutdown. Includes a time lapse video: http://www.networkrailmediacentre.co...-london-bridge What is the device at 2:45 called? It is an IRONMEN trolley. PA |
London Bridge Bank holiday work
On Thu, 03 Sep 2015 15:46:36 +0100, Peter Able wrote:
It is an IRONMEN trolley. Subject of a recent RAIB report IIRC. https://www.gov.uk/government/news/r...t-raven-level- crossing -- Denis McMahon, |
All times are GMT. The time now is 02:39 AM. |
Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk