London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old December 14th 15, 01:36 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Crossrail to Tring

Modern Railways says that the Crossrail to Tring plan is going cold. I
am surprised. They can't be planning to terminate 60% of the trains at
Paddington / Old Oak indefinitely. After all, they are talking about
extending the Bakerloo southward because Elephant is too near to London
to generate significant flow into London... surely Paddington is even
nearer.

I've been thinking about the different philosophies on the big 3
projects. Thameslink has 12 southern branches, far more than either of
the Crossrails. I think with Crossrail 1, the aim is to run 24tph from
Paddington to Liverpool Street, and the extensions into the suburbs are
less important. But with Thameslink the branches are everything and the
tunnel through the middle is just a way of not having to build loads of
platforms at Blackfriars and St Pancras.

But I think the 12 southern branches on Thameslink is a mistake, and
will cause so many people to wait around on the Zone 1 southbound
platforms for up to half an hour for their train home that the stations
will be regularly closed for crowding. This will be resolved about 6
months after the project opens by ditching about half of the southern
branches and running the other ones quarter-hourly.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
No surprise: Crossrail to Tring proposal Recliner[_2_] London Transport 14 August 24th 14 02:23 PM
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 06:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 03:06 PM


All times are GMT. The time now is 11:01 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017