London Banter

London Banter (https://www.londonbanter.co.uk/forum.php)
-   London Transport (https://www.londonbanter.co.uk/london-transport/)
-   -   Tower Bridge To Close For 3 Months (https://www.londonbanter.co.uk/london-transport/15052-tower-bridge-close-3-months.html)

Robin9 August 19th 16 05:53 PM

Tower Bridge To Close For 3 Months
 
TfL have announced - to me at any rate by email - that
Tower Bridge will be closed from the 1st of October until
the 30th of December.

It will be interesting to see how serious the resulting
traffic problems will be during a three month period which
normally sees larger than normal traffic flows.

Robin[_4_] August 20th 16 06:45 AM

Tower Bridge To Close For 3 Months
 
On 19/08/2016 18:53, Robin9 wrote:
TfL have announced - to me at any rate by email - that
Tower Bridge will be closed from the 1st of October until
the 30th of December.


The Corporation announced that in June.

It will be interesting to see how serious the resulting
traffic problems will be during a three month period which
normally sees larger than normal traffic flows.

Indeed. And interesting^2 if there's a Blackwall Tunnel closure :(

--
Robin
reply-to address is (intended to be) valid

tim... August 20th 16 04:45 PM

Tower Bridge To Close For 3 Months
 

"Robin9" wrote in message
...

TfL have announced - to me at any rate by email - that
Tower Bridge will be closed from the 1st of October until
the 30th of December.

It will be interesting to see how serious the resulting
traffic problems will be during a three month period which
normally sees larger than normal traffic flows.


surely to stop people driving over it, it would need to be open :-)

tim




Arthur Figgis August 21st 16 10:11 AM

Tower Bridge To Close For 3 Months
 
On 20/08/2016 17:45, tim... wrote:

"Robin9" wrote in message
...

TfL have announced - to me at any rate by email - that
Tower Bridge will be closed from the 1st of October until
the 30th of December.

It will be interesting to see how serious the resulting
traffic problems will be during a three month period which
normally sees larger than normal traffic flows.


surely to stop people driving over it, it would need to be open :-)


That might not stop a bus.

--
Arthur Figgis Surrey, UK

Mizter T September 28th 16 02:44 PM

Tower Bridge To Close For 3 Months
 

On 19/08/2016 18:53, Robin9 wrote:
TfL have announced - to me at any rate by email - that
Tower Bridge will be closed from the 1st of October until
the 30th of December.


Just a reminder that this is starting on Saturday.

Rotherhithe Tunnel is going to be fun!

Robin9 September 30th 16 09:09 AM

TfL say that apart from three weekends, the bridge
will remain open to pedestrians.


All times are GMT. The time now is 09:29 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk