![]() |
New North-South Cycle Superhighway
|
New North-South Cycle Superhighway
In article
rg, (Recliner) wrote: http://www.standard.co.uk/news/trans...outh-cycle-sup erhighway-linking-kings-cross-and-elephant-and-castle-a3334166.html Frustratingly, there is a plan of the scheme in the article but it's unreadable. It's attributed to TfL. Doesn't anyone have a link to the original, hopefully readable version? -- Colin Rosenstiel |
New North-South Cycle Superhighway
wrote on 02 Sep 2016 at 17:45 ...
In article rg, (Recliner) wrote: http://www.standard.co.uk/news/trans...outh-cycle-sup erhighway-linking-kings-cross-and-elephant-and-castle-a3334166.html Frustratingly, there is a plan of the scheme in the article but it's unreadable. It's attributed to TfL. Doesn't anyone have a link to the original, hopefully readable version? That map is in the HTML document at https://consultations.tfl.gov.uk/cyc...le-north-south and is also in PDF format at https://consultations.tfl.gov.uk/cyc...---s-cross.pdf Yes, that last link really does end in king---s-cross.pdf ! -- Richard J. (to email me, swap 'uk' and 'yon' in address) --- This email has been checked for viruses by Avast antivirus software. https://www.avast.com/antivirus |
New North-South Cycle Superhighway
In article ,
(Richard J.) wrote: wrote on 02 Sep 2016 at 17:45 ... In article rg, (Recliner) wrote: http://www.standard.co.uk/news/trans...outh-cycle-sup erhighway-linking-kings-cross-and-elephant-and-castle-a3334166.html Frustratingly, there is a plan of the scheme in the article but it's unreadable. It's attributed to TfL. Doesn't anyone have a link to the original, hopefully readable version? That map is in the HTML document at https://consultations.tfl.gov.uk/cyc...le-north-south and is also in PDF format at https://consultations.tfl.gov.uk/cyc...s/north-south- cycle-superhighway-route-between-stonecutter-street-and-king---s-cross.pdf Yes, that last link really does end in king---s-cross.pdf ! Thanks. So this joins up at Stonecutter Street with CS6 under construction. That has a two way cycleway on the west side of Farringdon Street while this extension from there to St Pancras has with-flow cycleways both sides of Farringdon Street. How do they join up? No indications of junction works, signals etc. -- Colin Rosenstiel |
New North-South Cycle Superhighway
Plan of Farringdon Street cycle lane switch at Stonecutter Street: https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
|
New North-South Cycle Superhighway
|
All times are GMT. The time now is 01:04 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk