London Banter

London Banter (https://www.londonbanter.co.uk/forum.php)
-   London Transport (https://www.londonbanter.co.uk/london-transport/)
-   -   Abbey Wood, latest pictures (https://www.londonbanter.co.uk/london-transport/15104-abbey-wood-latest-pictures.html)

Clive D.W. Feather September 14th 16 09:27 AM

Abbey Wood, latest pictures
 
On 02/09/2016 18:04, wrote:
The bit that surprises me is that the DC tracks still run into Euston since
the 378s can be dual voltage so all trains to the terminus could be 25KV
electrified. The signalling is older and may have fewer immunisation
problems for now.


It will have been immunised back at the days of installation and again
when resignalled in the noughties. So no work is required.

I don't think you want the 378 raising/lowering pans right at Camden
Junction and clogging it up. And you can't do it on the New Lines
because there's no clearance for wires. So they need to run into Euston
on third rail anyway.



All times are GMT. The time now is 03:49 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk